J. Rose Wallick
U.S. Geological Survey, Portland, OR
Activity
2017
-
RESERVOIR–DOWNSTREAM SEDIMENT BALANCE FROM ANNUAL DRAWDOWNS AT FALL CREEK LAKE, OREGON
T356 Advances and Challenges in Quantifying Sediment Budgets for River Systems (Posters)Wednesday, 25 October 20179:00 AM - 6:30 PMHalls 4EF
-
FLUVIAL EROSION AND SEDIMENT DELIVERY AFTER THE 2014 OSO LANDSLIDE BASED ON REPEAT STRUCTURE-FROM-MOTION PHOTOGRAMMETRY
T382 Change Detection Photogrammetry in Earth Science (Posters)Wednesday, 25 October 20179:00 AM - 6:30 PMHalls 4EF
2014
-
WASTING AWAY IN WESTERN OREGON: GEOLOGIC AND PHYSIOGRAPHIC CONTROLS ON BED-MATERIAL YIELD, TRANSPORT, AND CHANNEL MORPHOLOGY FOR ALLUVIAL AND BEDROCK RIVERS
T274 Progress and Challenges in Developing Tools and Approaches Used in Sediment BudgetsWednesday, 22 October 20148:00 AM - 12:00 PM208/209
2009
-
COMPARISON OF PRE- AND POST-DAM ATTRIBUTES OF THE RESERVOIR REACH OF THE SANDY RIVER FOLLOWING REMOVAL OF OREGON'S MARMOT DAM
T38 Hydrogeomorphic and Ecohydrologic Consequences of Extraordinary Sediment Loading (Posters)Sunday, 18 October 20099:00 AM - 6:00 PMHall A