Irene Melero Asensio
Torrejon de Ardoz, N/A
Activity
2010
-
PRELIMINARY RESULTS FROM THE 2009 AND 2010 CORE DRILLINGS OF THE MALINGEN STRUCTURE, A PROBABLE DOUBLET TO THE LOCKNE MARINE-TARGET IMPACT CRATER, CENTRAL SWEDEN
T116 Impact Cratering: From the Lab to the Field; from the Earth to the Planets (Posters)Monday, 1 November 20108:00 AM - 6:00 PMHall D
-
THE NEW FACILITY FOR EXPERIMENTAL IMPACT CRATERING AT CENTRO DE ASTROBIOLOGíA, SPAIN
T69 Impact Cratering: From the Lab to the Field; from the Earth to the PlanetsSunday, 31 October 20101:30 PM - 5:30 PMMile High Ballroom Prefunction