Thomas B. Boving
University of Rhode Island, Kingston, RI
Activity
2019
-
COUPLING GPR AND ERT TECHNIQUES FOR DELINEATING SALTWATER-FRESHWATER INTERFACE IN A COASTAL AQUIFER
T30 Coastal Hydrogeology in An Age of Rising Seas (Posters)Sunday, 22 September 20199:00 AM - 5:30 PMHall AB, North Building
2014
-
PILOT-SCALE FIELD TEST OF SOLUBILITY ENHANCED IN SITU CHEMICAL OXIDATION OF VOLATILE ORGANIC CONTAMINANTS
63 Groundwater Contamination and Remediation: Challenges and Innovative Solutions IITuesday, 25 March 20148:00 AM - 11:40 AMCommonwealth Salon 4
2013
-
ENHANCED STORMWATER CONTAMINANT REMOVAL USING MODIFIED SORBENTS IN TREE FILTERS
23 Basic and Applied Research on Environmental Geoscience and BiogeochemistryThursday, 21 March 20138:00 AM - 12:00 PMCeiba Room
2012
-
SORPTION CAPACITY OF PAHS IN RHODE ISLAND SOILS ALONG AN URBAN TO RURAL GRADIENT
31 State and Fate of Urban Watersheds in the Northeast (Posters)Monday, 19 March 20128:00 AM - 12:00 PMBallrooms A & C and Ballroom Pre-function Area
-
COMBINED DESORPTION AND OXIDATION OF POLYCYCLIC AROMATIC HYDROCARBON (PAH) USING HYDROXYPORPYL-ß-CYCLODEXTRIN (HPCD)
11 Environmental Geoscience and HydrogeologySunday, 18 March 20121:30 PM - 5:30 PMBallroom B
-
BATCH SCALE STUDY OF PALLADIUM ENHANCED NANOSCALE ZERO VALENT IRON DECHLORINATION OF TETRACHLOROETHENE
7 Environmental Geoscience and Hydrogeology (Posters) ISunday, 18 March 20128:00 AM - 12:00 PMBallrooms A & C and Ballroom Pre-function Area
2009
-
IMPROVING DRINKING WATER QUALITY BY BETTER UNDERSTANDING GROUND-WATER/SURFACE-WATER INTERACTION
46 Environmental Geoscience/HydrogeologyTuesday, 24 March 20098:00 AM - 10:00 AM
2008
-
DETERMINATION OF LIGNOCELLULOSIC MATERIALS SORPTION POTENTIAL FOR STORMWATER CONTAMINANTS
15 Water Quality and HydrogeologyTuesday, 1 April 20081:00 PM - 4:00 PM
2006
-
ATTENUATION OF SOLUBLE POLYCYCLIC AROMATIC HYDROCARBONS IN A DETENTION POND SYSTEM: DOES IT WORK?
T12 Nonpoint Source Pollution: Sources, Processes, Prediction, and SolutionsSunday, 22 October 20068:00 AM - 12:00 PM
2005
-
HIGHWAY FLARES AND RUNOFF: A POTENTIAL SOURCE OF PERCHLORATE TO SURFACE WATER IN RHODE ISLAND
203 Environmental GeoscienceWednesday, 19 October 20058:00 AM - 12:00 PM
-
ANALYSIS OF AQUIFER TEST DATA AND IMPLICATIONS IN AN MTBE-CONTAMINATED FRACTURED BEDROCK AQUIFER, PASCOAG, RHODE ISLAND
T12 Water Resource Management and Planning for Fractured and Karstic AquifersSunday, 16 October 20058:00 AM - 12:00 PM
2004
-
ANALYSIS OF AQUEOUS METAL CONCENTRATION WITH XRF
242 Environmental Geoscience (Posters) IIWednesday, 10 November 20041:30 PM - 5:30 PM
-
A WOOD FILTER PILOT TEST: AN INNOVATIVE TREATMENT METHOD FOR ROADWAY RUNOFF POLLUTANTS
T72 Hydrologic Impacts of Urbanization and Suburbanization on Water ResourcesMonday, 8 November 20048:00 AM - 12:00 PM
-
STORMWATER RUNOFF TREATMENT WITH VORTECHS® STRUCTURES
64 Environmental Geoscience IMonday, 8 November 20048:00 AM - 12:00 PM
2003
-
COMPARISON OF TWO CYCLODEXTRIN REMEDIATION APPROACHES: LINE-DRIVE VERSUS PUSH-PULL
T142 Transport and Remediation of Organic Compounds in the Saturated ZoneTuesday, 4 November 20038:00 AM - 12:00 PM
-
HENRY’S LAW CONSTANTS OF CYCLODEXTRIN-TCE SYSTEMS AT VARIOUS CONCENTRATION AND TEMPERATURE CONDITIONS
T142 Transport and Remediation of Organic Compounds in the Saturated ZoneTuesday, 4 November 20038:00 AM - 12:00 PM
-
EFFECTIVENESS OF USING AN ULTRAFILTRATION (UF) SYSTEM IN BATCH AND CONTINUOUS MODES TO RECONCENTRATE CYCLODEXTRIN
T142 Transport and Remediation of Organic Compounds in the Saturated ZoneTuesday, 4 November 20038:00 AM - 12:00 PM
2002
-
CYCLODEXTRIN ENHANCED REMOVAL OF DNAPL IN THE FIELD UNDER UNCONSTRAINT CONDITIONS
T232 Characterization, Attenuation, and Remediation of Subsurface Contaminants in Heterogeneous Chemical or Physical Settings IIWednesday, 30 October 20021:30 PM - 5:30 PM
-
INTEGRATED DESIGN OF A DNAPL PARTITIONING TRACER TEST
T232 Characterization, Attenuation, and Remediation of Subsurface Contaminants in Heterogeneous Chemical or Physical Settings IIWednesday, 30 October 20021:30 PM - 5:30 PM
-
CHEMICAL RETENTION CAPACITY OF A NEWLY CONSTRUCTED ROADWAY RUNOFF DETENTION POND SYSTEM
2 Water: Precipitation to Groundwater Remediation (Posters)Monday, 25 March 20028:00 AM - 12:00 PM
-
TRICHLOROETHYLENE REMEDIATION BY CYCLODEXTRIN OF SOIL FROM VIRGINIA BEACH, VA
2 Water: Precipitation to Groundwater Remediation (Posters)Monday, 25 March 20028:00 AM - 12:00 PM
-
POTENTIAL REMEDIATION OF HEAVY METALS FOUND IN THE ENVIRONMENT USING WOOD: RATE OF SORPTION OF CU, ZN AND CR ON ASPEN WOOD WOOL
2 Water: Precipitation to Groundwater Remediation (Posters)Monday, 25 March 20028:00 AM - 12:00 PM
2001
-
DIFFUSIVE TRANSPORT OF CYCLODEXTRIN THROUGH IGNEOUS ROCKS
T116 Diffusive Transport Processes in the SubsurfaceWednesday, 7 November 20018:00 AM - 12:00 PM
Date Unknown
-
A PRELIMINARY WEB PORTAL FOR RHODE ISLAND WATER RESOURCES
243 Hydrogeology (Posters) II
-
INNOVATIVE TREATMENT METHOD FOR REMOVING ORGANIC CONTAMINANTS FROM ROADWAY RUNOFF
151 Environmental Geoscience (Posters)
-
MATRIX DIFFUSION IN IGNEOUS ROCKS
34 Geologic Aspects of Environmental Problems in the Northeast (Posters)
-
ASSESSING THE EFFECT OF FLUCTUATING RIVER STAGE ON AN MTBE GROUND-WATER PLUME DISCHARGING TO SURFACE WATER, PASCOAG, RI
T89 Detecting and Characterizing Fluxes of Water and Dissolved Constituents Across the Groundwater Surface-water Interface (Posters)
-
IMPACT OF A POROUS PAVEMENT PARKING LOT ON SUBSURFACE WATER QUALITY
243 Hydrogeology (Posters) II