19 Surficial Geology and Geomorphology in the Appalachians: Progress and Applications
Thursday, 23 March 2006
1:30 PM - 5:50 PM
LANDSLIDE CORRECTION ON I-75 IN CAMPBELL COUNTY, TENNESSEE
Paper number: 19-11
Program: THEME SESSIONS
Time: 4:50 PM – 5:10 PM
Authors
Abstract
Repair of the landslide required massive excavation into in-place stable bedrock and the rebuilding of the highway embankment. A new technology, referred to as “Launched Soil Nails”, was employed during the slide repair operation to temporarily stabilize a 15 meter (50 foot) high, 100 meter (300 foot) long soil cut slope. The landslide repair was accomplished by the construction of a conventional graded rock buttress in less than 60 days.