Application: The information provided in this paper can be used by all producers to determine if a well is electrically inefficient and specific corrective measures that can be used to reduce energy consumption.
Results/Observations/Conclusions: Typical energy efficiency projects are economically viable with short payback periods and high ROI. At a time of high oil prices, this is the time to correct pumping units with problems. In addition, these case studies show that there are side benefits to corrective measures that can increase well productivity.
Significance of subject matter: Reluctance in implementing a change in operating practices puts unnecessary demands on the nation's power grid. Wells operated inefficiently may prematurely experience their economic limit further affecting domestic production. Continued long term pumping inefficiencies have negative implications for the operator, for the fields and for the consumers.