1 SPE: Rotary and Coiled Tubing Drilling Applications
Monday, 8 May 2006
8:00 AM - 12:00 PM
IMPROVING DRILLING PERFORMANCE USING ADVANCED DRILLPIPE WITH STREAMLINE CONNECTIONS
Paper number: 1-4
Program: SPE SESSIONS
Time: 9:30 AM – 10:00 AM
Authors
-
Graham L. AlvordN/A, N/A
-
Todd K. DriskillN/A, N/A
-
Ron WilsonN/A, N/A
-
Vernon Troy JohnsonN/A, N/A
-
Raymond Brett ChandlerN/A, N/A
Abstract
The slim hole 4 in. drillstring design permitted use of the same drill bit/casing program as employed previously with conventional 3 1/2 in. pipe. A high performance, double shoulder connection for 4 in. drillpipe was selected that maintained a tool joint outside diameter similar to conventional 3 1/2 in. drillpipe tool joints. This streamline connection maintains fishing ability in both cased and open hole. The 4 in. high performance drillpipe was suitable for drilling larger diameter intermediate hole sections eliminating a requirement for 5 in. drillpipe. This drastically reduced the amount of time spend picking up and laying down drillstrings, resulting in reduced HSE exposure handling drillpipe.
This paper addresses these considerations and provides case histories that clearly illustrate the benefits and savings that can be achieved and the limitations using this new drillpipe design configuration.