SKYTOP: A CASE HISTORY OF HIGHWAY CONSTRUCTION THROUGH A SULFIDE VEIN DEPOSIT IN CENTRE COUNTRY, PENNSYLVANIA
Paper number: 1-8
Program: Technical Sessions
Time: 10:00 AM – 10:15 AM
Authors
-
Arnold G. DodenGeologic Mapping and Resource Evaluation, Inc, State College, PA
-
Ryan MathurJuniata College, Huntingdon, PA
-
Laurence J. MuttiJuniata College, Huntingdon, PA
Abstract
An environmental constraint that mandates “movable” toxic material to be moved out of the Buffalo Run drainage basin (Class A stream) require scientific compromises and engineering challenges. In addition to removal of “acid” rock to proposed new land-fill, remediation plans must accommodate in situ treatment of transported material in already completed sections of the highway, where it was used as embankment fill, road-bed sub-base to elevate the north-bound lane up to 17 feet over a distance of 5000 feet, and as buttress material to load the toe of major cut face in a land slide prone slope.
In situ treatment experiments were compromised by a lack of penetration of the slurry into the “fill”, and by a permeability anisotropy (layering) engendered by blading and covering with a “bag house lime” (BHL) a waste product from a local lime plant.