16 Fluvial Geomorphology and Watershed Studies in the Eastern United States (Posters)
Thursday, 10 April 2008
1:30 PM - 5:30 PM
STABILIZATION OF RECONFIGURED CHANNELS BY IN-STREAM STRUCTURES: IS IT AN EFFECTIVE METHODOLOGY?
Paper number: 16-3
Program: THEME SESSIONS
Time: 1:30 PM – 5:30 PM
Authors
-
Christopher TennantWestern Carolina University, Cullowhee, NC
-
R. Craig KochelBucknell University, Lewisburg, PA
-
Eric NeffWestern Carolina University, Cullowhee, NC
Abstract
In most cases, in-stream structures (e.g., cross vanes, J-hooks, and rock vanes) were used to stabilize reconfigured channels following construction. A rapid assessment of in-stream structures at 26 locations, including a number of those for which monitoring data were analyzed, showed that structures at reconfigured sites exhibited a high rate of impairment where adjustments in channel capacity exceeded 20 %. Presumably, channel adjustments between structure emplacements and along their margins where they were attached to the banks led to their failure. Thus, it is questionable whether in-stream structures can stabilize reconfigured channels as generally intended along dynamic rivers characterized by non-cohesive banks, high stream powers, and large sediment supplies. Natural channel recovery may be a more appropriate approach where space is available and the potential damage to infrastructure is limited.