T54 Geological Mapping: Key to Successful Management of Water and Land Resources II
Sunday, 18 October 2009
1:30 PM - 5:30 PM
B116
FROM 2D CROSS-SECTIONS TO A 3D HYDROGEOLOGIC FRAMEWORK MODEL: A STREAMLINED TOOLSET FOR INTEGRATED DATA MANAGEMENT, MODELING, ANALYSIS, AND VISUALIZATION
Paper number: T54-4
Program: Technical Sessions
Time: 2:15 PM – 2:30 PM
Authors
-
Scott BowenTinker Air Force Base, Oklahoma City, OK
-
Thomas BattenhouseSAIC, Twinsburg, OH
-
Robert PorgesSAIC, Twinsburg, OH
-
Tad C. FoxSAIC, Twinsburg, OH
Abstract
A versatile system integrating 3D modeling with flexible data management was developed to automate data processing and management, model production and QA, and cross-section generation. New data are imported via streamlined tools into the project database and exported automatically to the 3D modeling software. Both model and section production are automated, freeing scientists to focus on model visualization and analysis rather than assembly. Production-quality sections including lithologic, HSU, and potentiometric interpretations along with well data (gamma logs, filter packs, screen intervals), surface features (water bodies, roads, buildings), and a polished layout are generated for any traverse in ten minutes. Next steps include customizing an existing web portal to allow 1) access to the project database and cross-sections in a GIS framework, 2) visualization of well construction and interpretation details, and 3) dynamic model updates and section generation. The tools and methods developed here can be applied readily to other sites to support objectives beyond environmental restoration, including water resource evaluation and carbon sequestration.