33 Reservoir Characterization II
Friday, 28 May 2010
1:30 PM - 6:00 PM
Platinum 4
RESERVOIR MODELING OF THE BELRIDGE DIATOMITE
Paper number: 33-9
Program: Theme Sessions
Time: 5:30 PM – 6:00 PM
Authors
Abstract
A workflow for an improved volumetric hydrocarbon estimation is presented. This is an integrated workflow which includes the use of mineralogy (XRF), oil-base core data, mercury-air capillary, open-hole logs, production tests, and 3D geological modeling software.