3 Geoscience and Engineering at the Deep Underground Science and Engineering Lab (DUSEL) in Lead, South Dakota
Wednesday, 21 April 2010
8:00 AM - 12:00 PM
Alpine Room
CIVIL ENGINEERING AND MINING PROJECTS—RECONCILIATION OF DESIGN PHILOSOPHIES
Paper number: 3-3
Program: Theme Sessions
Time: 8:40 AM – 9:00 AM
Authors
-
Roman S. PopielakGolder Associates Inc, Lakewood, CO
-
David M. VardimanDUSEL, Victor, CO
Abstract
The first aspect differentiating mining and civil engineering projects is the issue of “design life” or “stand-up time.” In mines, the object is to get the underground excavations to stand up just long enough for the ore to be extracted: in underground civil engineering projects, the underground excavations must be stable, without any rockfalls, for at least the life if the project, which may be a hundred years or more.An important difference is also the concept of maintenance. In mines, there is a tolerance for rockfalls (within the limits of mine safety) as there are mining equipment and personnel on hand who can easily stabilize any area of the mine. In civil engineering projects, there is little or no tolerance for rockfalls when the project is in service due to the safety hazard, conduct of scientific experiments and, especially because there is no mining equipment on hand to undertake stabilization work.
Reconciliation of these differing design philosophies is of particular importance for DUSEL’s project, which involves construction of the large excavations applying civil engineering standards in a deep mining environment.