T15 Reducing the Environmental Impact of Uranium In Situ Recovery
Sunday, 31 October 2010
8:00 AM - 12:00 PM
Room 205
3-D URANIUM TRANSPORT EXPERIMENTS AT THE INTERMEDIATE SCALE: DOES ‘BIGGER' EQUATE WITH ‘MORE COMPLEX'?
Paper number: T15-7
Program: Technical Sessions
Time: 9:40 AM – 9:55 AM
Authors
-
Derrick R. RodriguezColorado School of Mines, Golden, CO
-
Bruce D. HoneymanColorado School of Mines, Golden, CO
Abstract
The experimental system consisted of a 3-D tank with dimensions of 2.4m x 0.61m x 0.61m (LxHxW). This tank was filled with uranium contaminated sediment collected from the Naturita field site, a former uranium mill in southwestern Colorado. 1157kg of sediment was heterogeneously packed into the tank using five distinct size fractions: <2mm composite, <0.250mm, >0.250mm, 0.125-0.250mm, and 4-12mm. Groundwater flow was established with constant head boundaries using a uranium free artificial ground water; steady state flow continued for 9 months. A bromide tracer test was used to characterize the flow field. Small groundwater wells were installed to allow for aqueous characterization. The results show simplified behavior in the sense that both the uranium and bromide breakthrough curves (BTC) were largely indistinguishable from typical column scale BTC, and several geochemical relationships appear to be at equilibrium or at least steady state. The implication of this work is that upscaled reactive transport models may not need to explicitly include all of the micro-scale nuances to give a reliable predictor of uranium migration behavior. From a mining perspective upscaled models would allow for more predictable production, better regulatory controls, and more reliable remediation strategies.