ROCK SLOPE STABILIZATION OF FEDEX DRIVE, ALLEGHENY COUNTY, PENNSYLVANIA
Paper number: 3-1
Program: Theme Sessions
Time: 9:45 AM – 10:00 AM
Authors
Abstract
Gannett Fleming, Inc. was retained by FedEx to evaluate the nature of the failures occurring in the rock slope and to prepare a mitigation plan to reduce the hazard. The deltaic depositional environment has contributed to the variable and channelized nature of the Morgantown Sandstone. Depositional features including cross bedding within the sandstone and slickensides within the claystone were revealed during construction of the cut, which created irregular fracture patterns after the blasting. Given the variable nature of the rock and unpredictable fracture patterns that resulted from the blasting, the recommended mitigation plan included a combination of excavation, rock scaling, anchored wire mesh, and shotcrete. The construction was completed during the fall and winter of 2010. This presentation highlights the findings of the evaluations, as well as the various rock slope mitigation techniques utilized to stabilize the slope.