2 The Legacy of Humans and Glaciation in Northeastern Rivers
Sunday, 18 March 2012
8:00 AM - 12:00 PM
Capital Room 1
PRE-DAM REMOVAL GEOMORPHIC MONITORING ON THE PENOBSCOT RIVER, MAINE
Paper number: 2-12
Program: Theme Sessions
Time: 11:40 AM – 12:00 PM
Authors
-
Daniel F. BelknapUniversity of Maine, Orono, ME
-
Andrew R. HellerUniversity of Maine, Orono, ME
-
Mathias J. CollinsNOAA, Gloucester, MA
-
Charles S. BaederAugusta, ME
Abstract
Geomorphic monitoring was undertaken at monumented river cross-sections within areas anticipated to be affected by the dam removals to provide baseline data on pre-dam removal channel bathymetry, sediment size, and bank conditions. Data collection included repeated, seasonal photographic surveys, bathymetric surveys at each cross section, video-based channel sediment characterization, bank geomorphology studies, and geophysical characterization of impoundment sediment thickness. Post-dam removal monitoring at these locations is planned. Over the two-year monitoring period, few changes were noted in river bathymetry or bank characteristics. Channel sediment characterization revealed that, within the study area, the Penobscot River channel in both flowing and impounded reaches is dominated by coarse sediment, ranging from gravel to boulder-sized clasts with a predominately sand matrix. This contrasts with the fine-grained sediment storage found in many impoundments, and is interpreted to be an artifact of the region’s complex Late-Pleistocene and Holocene geological history and the dams’ physical features and modes of operation.