T244 The Hydrology of Headwater Catchments (Posters)
Wednesday, 7 November 2012
9:00 AM - 6:00 PM
Hall B
THE EFFECT OF DAM REMOVAL ON TRANSPORT OF SEDIMENT IN TWELVE-MILE CREEK, SC
Paper number: T244-5
Program: Technical Sessions
Time: 9:00 AM – 6:00 PM
Authors
-
Lawrence C. MurdochClemson University, Clemson, SC
-
William ChamleeN/A, Clemson, SC
-
Tyler WaterhouseN/A, Clemson, N/A
Abstract
The sand bed upstream from the former dam was roughly level, more than 1 m thick and more than 10 m wide. During the first survey the initial volume was estimated to be more than 25000 m^3. At three months more than 8000 m^3 had been transported from the sand deposit and 9000 m^3 at 4 months. The sand bed was completely lost at 8 months post dam removal. The first measurement station downstream from the dam had an average bed elevation increase of more than 2 m. All the stations downstream from the dam have accumulated sediment, but the change in average bed height progressively decreases downstream. Most of sand appears to be within 1 km downstream of the dam as of June 2012, according to our measurement.