48 Landscape and Hydrologic Response and Recovery from Watershed Disturbance (Posters)

Tuesday, 22 March 2016
1:30 PM - 5:30 PM
Convention Hall


SEDIMENT SLUICING TO MANAGE SEDIMENT ACCUMULATION IN PARADISE POND, NORTHAMPTON, MASSACHUSETTS

Paper number: 48-2
Program: Theme Sessions
Time: 1:30 PM – 5:30 PM


Authors


Abstract

The viability of sluicing sediment from a small impoundment during high flow events is being investigated as an alternative to dry dredging. Paradise Pond (4 ha) is impounded by a 60m long, 5m high cement and masonry dam on the Mill River (140km2 watershed) in Northampton, Massachusetts. The dam is located 4km upstream of the confluence with the Connecticut River. During the last 50 years sediment removal was by dry excavation at 8-10 year intervals. Approximately 17,000 m3 of sediment were removed each time and used as daily cover for a local landfill. Closing of the landfill has made this option impractical. A new strategy is being developed that combines mechanical sediment displacement with sluicing through the gate at the bottom of the dam during high flow events (>500cfs). In this model, an excavator will move sediment accumulated in the upstream part of the pond to the downstream section next to the dam. The displaced sediment will then be released from the pond through the sluice gate at the bottom of the dam during high flow events when transport through the downstream fluvial system is assured.

To test the viability of this technique, a sluicing experiment was conducted during a large storm event (100mm of rain in a 24 hour period) on September 30th 2015. Peak stream discharge exceeded 3000 cfs and the sluice gate was opened for approximately 10 hours. Measurements of water and bedload sediment velocity were made, after peak flow, at five locations in the pond using a Teledyne RDI RiverRay Acoustic Doppler Current Profiler (ADCP). Water velocities in the pond approximately 100m upstream of the dam exceeded 45 cm/sec at a discharge of 1600 cfs. Stationary boat moving bed tests determined bedload sediment movement at velocities ranging from 0.45 to 6.0 cm/sec. However, bathymetric surveys conducted before and after the event did not show significant erosion of the pond bottom. It may be that high sediment inflow into the pond during this event balanced the sediment leaving the pond so there was no net sediment loss. Higher bed velocities may be needed to mobilize sediment at the bottom of the pond. This could be accomplished by mechanically moving more sediment to the area of the sluice gate prior to the event. This would reduce the cross section available for flow causing an increase in velocity.


Geological Society of America Abstracts with Programs. Vol. 48, No. 1

doi: 10.1130/abs/2016NE-272577

© Copyright 2016 The Geological Society of America (GSA), all rights reserved. Permission is hereby granted to the author(s) of this abstract to reproduce and distribute it freely, for noncommercial purposes. Permission is hereby granted to any individual scientist to download a single copy of this electronic file and reproduce up to 20 paper copies for noncommercial purposes advancing science and education, including classroom use, providing all reproductions include the complete content shown here, including the author information. All other forms of reproduction and/or transmittal are prohibited without written permission from GSA Copyright Permissions.