T153 Management and Restoration of Fluvial Systems: Rehabilitating or Accommodating Altered Hydrologic and Sediment Regimes (Posters)
Monday, 26 September 2016
9:00 AM - 6:30 PM
Exhibit Hall E/F
USING 1D2D HYDRAULIC MODELING TO ASSESS THE EFFECTIVENESS OF PROPOSED FLOW-CONNECTIVITY ENHANCEMENT PROJECTS IN THE ATCHAFALAYA RIVER BASIN, LOUISIANA
Paper number: T153-3
Program: Technical Sessions
Time: 9:00 AM – 6:30 PM
Authors
-
Jonathan W.F. RemoSouthern Illinois University, Carbondale, IL
-
Bryan PiazzaBaton Rouge, LA
Abstract
Still, the floodplain wetlands provide many ecosystem services, including flood protection, biogeochemical cycling, wildlife habitat, and cultural resources. Decades of research and personal observation have convinced a diversity of stakeholder groups that restoring flow connectivity is essential to maintaining the ARB’s ecological integrity. However, spatially explicit data regarding hydrologic and geomorphic conditions remain a major research need to inform adaptive management practices.
To address this data gap, we collaborated with agencies and used existing geospatial datasets to develop a 1D2D hydraulic model using SOBEK 2.12 to realistically model a range of physical parameters (residence times, inundation extent, water depths, velocity) over a large spatial scale. While many restoration projects focus on short reaches and are based on opportunistic funding availability, a major goal here was to design a project that could assess already-proposed flow-connectivity enhancement projects in the 174 km2 Flat Lake Water Management Unit (FLWMU), a hydrologic subunit of the AR that was previously identified as a key area for restoring connectivity. Calibration runs indicate good agreement with observed flows; the three mainstem gages closest to FLWMU have MAEs (m) of 0.10, 0.27, and 0.12 and RMSEs (m) of 0.11, 0.27, and 0.15 respectively. An additional verification step examining inundation goodness of fit (F≈65) is comparable to accuracies reported in other studies. Ongoing research involves stepped implementation of the 171 recommended enhancement projects using fixed-discharge scenarios to quantify connectivity improvements; preliminary results will be discussed.
Geological Society of America Abstracts with Programs. Vol. 48, No. 7
doi: 10.1130/abs/2016AM-286644
© Copyright 2016 The Geological Society of America (GSA), all rights reserved. Permission is hereby granted to the author(s) of this abstract to reproduce and distribute it freely, for noncommercial purposes. Permission is hereby granted to any individual scientist to download a single copy of this electronic file and reproduce up to 20 paper copies for noncommercial purposes advancing science and education, including classroom use, providing all reproductions include the complete content shown here, including the author information. All other forms of reproduction and/or transmittal are prohibited without written permission from GSA Copyright Permissions.