245 D46. Advances in Geoscience Data Discovery, Delivery, and Use—Geoinformatics (Posters)

Wednesday, 7 November 2018
9:00 AM - 6:30 PM
Halls J-K


HAZARD ASSESSMENT FOR THE CONSTRUCTION SITE OF THE GRAND ETHIOPIAN RENAISSANCE DAM

Paper number: 245-4
Program: Technical Sessions
Time: 9:00 AM – 6:30 PM


Authors

  • Hafid Nanis Presenting Author
    College of Engineering Technology / Zuwara, Zuwara, LA
  • Mohamed Aly
    University of Arkansas, Fayetteville, AR

Abstract

The Grand Ethiopian Renaissance Dam, constructed in NW Ethiopia across the Nile River, brings a geopolitical conflict between the upstream country (Ethiopia) and the downstream countries (Sudan and Egypt). The potential negative impacts of the dam on the downstream countries are obvious and have been addressed comprehensively in numerous previous studies; however, this is out of focus of this research. The dam is located in the tropical zone with heavy rain and is surrounded by steep slopes, erodible soils, and unconsolidated rocks. So, the area is naturally prone to mass wasting and seismic events. Once the reservoir behind the dam is filled with water to its full capacity, reservoir-induced earthquakes, flash floods, and landslides are likely to occur. In this study, we assess hazards for the dam site and its surroundings using a GIS (Geographic Information Systems) model. Nine factors, including earthquakes, volcanoes, faults, fractures, lithology, slope, soil, precipitation, and groundwater depth, are considered in this investigation based on our familiarity with the study area. Factor weights are assigned according to their relative importance using the AHP (Analytic Hierarchy Process) approach, and then the weighted factors are incorporated together in the geospatial analysis to create a hazard index for the study area. Three zones of low, moderate, and high hazard are determined, and it is not a surprise that the dam is found in the high hazard zone. Unfortunately, natural hazards in the study area are nearly impossible to avoid, so strategies that deal with scenarios of future dam failure should be developed and become readily available before completing the dam construction and filling its reservoir.

Keywords: GIS, dam, GERD, AHP, hazard assessment.


Geological Society of America Abstracts with Programs. Vol. 50, No. 6

doi: 10.1130/abs/2018AM-320395

© Copyright 2018 The Geological Society of America (GSA), all rights reserved. Permission is hereby granted to the author(s) of this abstract to reproduce and distribute it freely, for noncommercial purposes. Permission is hereby granted to any individual scientist to download a single copy of this electronic file and reproduce up to 20 paper copies for noncommercial purposes advancing science and education, including classroom use, providing all reproductions include the complete content shown here, including the author information. All other forms of reproduction and/or transmittal are prohibited without written permission from GSA Copyright Permissions.