13 Hydrogeology (Posters)

Tuesday, 12 May 2020
9:00 AM - 6:00 PM
Fountain Ballroom


HYDROGEOLOGIC REPOSITORY AND COLOMBIA WATER WELL INSTALLATION, SEPTEMBER 2018

Paper number: 13-23
Program: Theme Sessions
Time: 9:00 AM – 6:00 PM


Authors

  • Joseph M. Saenz Presenting Author
    Naval Facilities Engineering Command Engineering and Expeditionary Warfare Center, Industrial Productions & Handling, Port Hueneme, CA
  • Kimo K. Zaiger
    Naval Facilities Engineering Command Engineering and Expeditionary Warfare Center, Oceans Engineering Division, Port Hueneme, CA
  • Andrew Tiedeman
    U.S. Naval Air Weapons Station, China Lake, CA
  • Robert Nordahl
    Naval Facilities Engineering Command Engineering and Expeditionary Warfare Center, Port Hueneme, CA
  • Chad Mitchell
    Gulfport, MS

Abstract

US Naval Forces Southern Command U.S. 4th Fleet focused on subject matter expert exchanges in water well construction efforts in Colombia, South America. U.S. Forces Southern Command U.S. 4th Fleet coordinated with 22 Naval Construction Regiment (22NCR) and the U.S. Embassy to access the technical expertise on water well site selection, design, and installation efforts. Technical expertise was provided by Naval Facilities Engineering Command (NAVFAC) Engineering and Expeditionary Warfare Center (EXWC), 22NCR, and the Seabees.

NAVFAC EXWC provided hydrogeologic and engineering technical field support to the Naval Mobile Construction Battalion One-Thirty-Three (NMCB 133) water well team for the Southern Partnership Station 2018 Well Project.

NAVFAC EXWC and NMCB 133 successfully installed an 800-foot-deep water well in Riohacha, Colombia. This process utilized a 6-5/8-inch outer diameter and stainless steel threading casing, including 200 feet of wire wrap screen (0.020-inch) set within water production bearing zones. The team targeted water screened through two water bearing zones below ground surface to provide clean water to an indigenous Wayuu tribal village in a sub-arid region near Riohacha, Colombia. The area has experienced multiple consecutive years of drought, and the local community needed better access to clean drinking water. The Team intended the well to improve the well-being of those affected by the drought and alleviate problems caused by the scarcity of water. The team calculated preliminary water well yield to range up to 98 gallons per minute, producing good (“sweet”) water production capacity.

The Colombian Ministry of Water informed the U.S. Navy that this effort has turned out to be the only fresh water well in the entire drought stricken region. The water well is currently filling up tanker trucks with the capability of holding up to 2,000 gallons of water, and successfully hauling fresh drinking water daily to over 20 local villages.


Geological Society of America Abstracts with Programs. Vol. 52, No. 4

doi: 10.1130/abs/2020CD-345981

© Copyright 2020 The Geological Society of America (GSA), all rights reserved. Permission is hereby granted to the author(s) of this abstract to reproduce and distribute it freely, for noncommercial purposes. Permission is hereby granted to any individual scientist to download a single copy of this electronic file and reproduce up to 20 paper copies for noncommercial purposes advancing science and education, including classroom use, providing all reproductions include the complete content shown here, including the author information. All other forms of reproduction and/or transmittal are prohibited without written permission from GSA Copyright Permissions.