21 Professional Applied Geology–Case Studies and Practice

Monday, 22 April 2024
1:30 PM - 5:30 PM
Kalahari Room, Oasis Hotel


MANAGED AQUIFER RECHARGE STUDIES FOR TEXAS

Paper number: 21-1
Program: Theme Sessions
Time: 1:30 PM – 1:50 PM


Authors

  • James Golab Presenting Author
    Texas Water Development Board, Austin, TX

Abstract

The Innovative Water Technologies (IWT) Department at the Texas Water Development Board (TWDB) is focuses on alternative water supplies including aquifer storage and recovery (ASR) and aquifer recharge (AR). The goals of IWT are to participate in research and demonstration projects, develop publications and other educational material, and disseminate information to the public.

In 2019, the 86th Texas Legislature directed the TWDB to: (1) complete a statewide suitability survey of ASR and AR, (2) conduct studies on ASR and AR projects, and (3) report the results of these studies to the regional water planning groups and interested persons. The statewide suitability survey was completed in 2020 and created a methodology for surveying ASR and AR suitability across Texas.

In 2022, IWT staff completed an aquifer characterization of the Carrizo-Wilcox Aquifer to support the Guadalupe-Blanco River Authority in their implementation of the ASR component of their Mid-Basin Water Supply Project. This study provided valuable spatial information on the depth, lithologic characteristics, and salinity of the aquifer that will be used to select the location for the project.

The second study was a longevity assessment of the City of Bandera’s public water supply wells. This project was completed in 2023 to support the city in their evaluation of water levels in the lower Trintiy aquifer. The predicted potential performance of the existing city wells during benchmark production scenarios will inform the development of a timeline for implementing ASR. This project also provides aquifer information such as projected drawdown depths that will be beneficial to planning an ASR project.

IWT staff are currently working on a managed aquifer paper and recharge suitability analysis. The paper is examining ASR and AR in the karstic Edwards and Trinity aquifer systems, highlights ASR and AR projects along the IH-35 corridor, and discusses the driving factors, challenges, and opportunities these projects encounter. IWT staff are also assessing the suitability of ASR or AR for the Lower Valley Water District (LVWD) using reclaimed water from the district’s new wastewater treatment facility that is currently in development. This project builds upon the statewide suitability survey with a more targeted examination of the Hueco Bolson Aquifer.


Geological Society of America Abstracts with Programs. Vol. 56, No. 3

doi: 10.1130/abs/2024NC-399140

© Copyright 2024 The Geological Society of America (GSA), all rights reserved. Permission is hereby granted to the author(s) of this abstract to reproduce and distribute it freely, for noncommercial purposes. Permission is hereby granted to any individual scientist to download a single copy of this electronic file and reproduce up to 20 paper copies for noncommercial purposes advancing science and education, including classroom use, providing all reproductions include the complete content shown here, including the author information. All other forms of reproduction and/or transmittal are prohibited without written permission from GSA Copyright Permissions.