28 Geohazards in Appalachia: From the Science to Practice I

Friday, 21 March 2025
8:00 AM - 10:00 AM
Appalachian C


Rockfall Mitigation along a Historic Rail Line

Paper number: 28-2
Program: Symposia
Time: 8:20 AM – 8:40 AM


Authors


Abstract

This project focused on rockfall mitigation along a transit line in Massachusetts, characterized by narrow rock cut walls and a mafic dike cross-cutting the site. The corridor also featured a historic keystone arch bridge, adding complexity to the mitigation efforts. The primary mitigation strategy involved the installation of draped wire mesh throughout most of the corridor to stabilize the rock faces and prevent rockfalls. In areas requiring additional reinforcement, reinforced rock nail wall was applied to ensure stability and safety. Overcoming construction challenges was a critical aspect of the project. Poor pull out testing delayed the project and required additional contractor coordination to complete the construction.

Geological Society of America Abstracts with Programs. Vol. 57, No. 2

doi: 10.1130/abs/2025SE-409280

© Copyright 2025 The Geological Society of America (GSA), all rights reserved. Permission is hereby granted to the author(s) of this abstract to reproduce and distribute it freely, for noncommercial purposes. Permission is hereby granted to any individual scientist to download a single copy of this electronic file and reproduce up to 20 paper copies for noncommercial purposes advancing science and education, including classroom use, providing all reproductions include the complete content shown here, including the author information. All other forms of reproduction and/or transmittal are prohibited without written permission from GSA Copyright Permissions.