186 Environmental Geoscience (Posters) III
REMEDIATION OF ARSENIC CONTAMINATED SOILS BY IN SITU CHEMICAL FIXATION METHOD
Paper number: 186-16
Program: Technical Sessions
Time: 1:30 PM – 5:30 PM
Authors
-
Rona J. DonahoeUniv of Alabama, Tuscaloosa, AL
-
Elizabeth Y. GrahamUniv of Alabama, Tuscaloosa, AL
Abstract
A modified 4 step sequential extraction procedure was used to further study the chemical fractionation of soil As before and after chemical treatment. Sequential extraction data show that soil treatment greatly reduced the most readily labile portion of arsenic which is extracted in the 1st step of the sequential extraction, with its value lowered to less than one tenth that of untreated soil. The potentially mobile fraction of soil arsenic extracted in the 2nd step of the sequential extraction is also considerably smaller after treatment. It is shown that after treatment, most of the As in the soil is transferred to amorphous Fe oxyhydroxides which are the major phases extracted in the 3rd step. X-ray absorption near edge spectra show As is present as As(V) in the treated soil. Extended X-ray absorption fine structure (EXAFS) spectral analysis indicates that a large portion of the total soil arsenic is coprecipitated and incorporated into newly formed amorphous Fe oxides after treatment.