Yan Pan
Austin, TX
Activity
2010
-
A CRITICAL ASSESSMENT OF CO2 INJECTION STRATEGIES IN SALINE AQUIFERS
22 Carbon Sequestration and Oil FieldsFriday, 28 May 20108:00 AM - 12:00 PMPlatinum 8
-
INTEGRATED CHARACTERIZATION AND SIMULATION OF THE FRACTURED TENSLEEP RESERVOIR AT TEAPOT DOME FOR CO2 INJECTION DESIGN
22 Carbon Sequestration and Oil FieldsFriday, 28 May 20108:00 AM - 12:00 PMPlatinum 8
-
OPTIMIZING CO2 EOR REAL TIME MANAGEMENT TO INCREASE "GREEN OIL" PRODUCTION THE ELK HILL CASE STUDY
22 Carbon Sequestration and Oil FieldsFriday, 28 May 20108:00 AM - 12:00 PMPlatinum 8
-
COMPARISON OF CHEMICAL AND HYSTERESIS CO2 TRAPPING IN THE NUGGET FORMATION
22 Carbon Sequestration and Oil FieldsFriday, 28 May 20108:00 AM - 12:00 PMPlatinum 8
-
BASIN WIDE PRESSURE CHANGES DUE TO CO2 STORAGE: CALIFORNIA PRODUCTION AS A REVERSE ANALOG
22 Carbon Sequestration and Oil FieldsFriday, 28 May 20108:00 AM - 12:00 PMPlatinum 8
-
EFFECT OF GRAVITY, FLOW RATE, AND SMALL SCALE HETEROGENEITY ON MULTIPHASE FLOW OF CO2 AND BRINE
22 Carbon Sequestration and Oil FieldsFriday, 28 May 20108:00 AM - 12:00 PMPlatinum 8
-
CHARACTERIZING THE PLUS FRACTION FOR EOS' APPLICATIONS
23 EOR Technologies IIFriday, 28 May 20108:30 AM - 12:00 PMPlatinum 9
-
EVALUATION OF THE EFFECT OF WETTABILITY ALTERATION ON OIL RECOVERY IN CARBONATE RESERVOIRS
23 EOR Technologies IIFriday, 28 May 20108:30 AM - 12:00 PMPlatinum 9
-
SELECTION OF THREE PHASE RELATIVE PERMEABILITY MODEL FOR MIXED WET RESERVOIRS
23 EOR Technologies IIFriday, 28 May 20108:30 AM - 12:00 PMPlatinum 9
-
NUMERICAL MODELING OF THE WATER IMBIBITION PROCESS IN WATER WET LABORATORY CORES
23 EOR Technologies IIFriday, 28 May 20108:30 AM - 12:00 PMPlatinum 9
-
EVALUATION OF CO2 INJECTIVITY FROM WATERFLOOD VALUES
23 EOR Technologies IIFriday, 28 May 20108:30 AM - 12:00 PMPlatinum 9
-
EXPERIMENTAL DETERMINATION OF MINIMUM MISCIBILITY PRESSURE BY GAS OIL IFT MEASUREMENTS FOR A GAS INJECTION EOR PROJECT
23 EOR Technologies IIFriday, 28 May 20108:30 AM - 12:00 PMPlatinum 9
-
DENSITY OF HIGH PRESSURE AND TEMPERATURE GAS RESERVOIRS: EFFECT OF NON HYDROCARBON CONTAMINANTS ON DENSITY OF NATURAL GAS MIXTURES
24 Advanced Reservoir Modeling ConceptsFriday, 28 May 20108:30 AM - 12:00 PMPlatinum 7
-
A HIERARCHICAL ASSISTED HISTORY MATCHING APPROACH WITH GLOBAL AND LOCAL PARAMETER UPDATES
24 Advanced Reservoir Modeling ConceptsFriday, 28 May 20108:30 AM - 12:00 PMPlatinum 7
-
INTELLIGENT TIME SUCCESSIVE PRODUCTION MODELING
24 Advanced Reservoir Modeling ConceptsFriday, 28 May 20108:30 AM - 12:00 PMPlatinum 7
-
PARAMETERIZATION TECHNIQUES TO IMPROVE MASS CONSERVATION AND DATA ASSIMILATION FOR ENSEMBLE KALMAN FILTER
24 Advanced Reservoir Modeling ConceptsFriday, 28 May 20108:30 AM - 12:00 PMPlatinum 7
-
ACCURATE SIMULATION OF NON DARCY FLOW IN STIMULATED FRACTURED SHALE RESERVOIRS
24 Advanced Reservoir Modeling ConceptsFriday, 28 May 20108:30 AM - 12:00 PMPlatinum 7
-
ASSISTED HISTORY MATCHING OF A WATERFLOODED RESERVOIR USING EXTENDED AND UNSCENTED KALMAN FILTERS
24 Advanced Reservoir Modeling ConceptsFriday, 28 May 20108:30 AM - 12:00 PMPlatinum 7
-
RECONFIGURING A CALIFORNIA PLATFORM FOR OFFSHORE CRUDE DEHYDRATION AND WATER DISPOSAL VIA INJECTION
26 California Monterey ReservoirsFriday, 28 May 20108:30 AM - 12:00 PMPlatinum 10
-
CHARACTERIZING FRACTURE DEVELOPMENT IN DIATOMITES WITH SEISMIC MOMENT TENSOR INVERSION ANALYSIS
26 California Monterey ReservoirsFriday, 28 May 20108:30 AM - 12:00 PMPlatinum 10
-
MONITORING OF MICROSEISMICITY IN DIATOMITES
26 California Monterey ReservoirsFriday, 28 May 20108:30 AM - 12:00 PMPlatinum 10
-
ENSEMBLE BASED CHARACTERIZATION AND HISTORY MATCHING OF NATURALLY FRACTURED TIGHT/SHALE GAS RESERVOIRS
34 Tight Plays and Unconventional ReservoirsFriday, 28 May 20101:30 PM - 5:00 PMPlatinum 7
-
SIMPLIFIED AND RIGOROUS FORECASTING OF TIGHT/SHALE GAS PRODUCTION
34 Tight Plays and Unconventional ReservoirsFriday, 28 May 20101:30 PM - 5:00 PMPlatinum 7
-
IMPACT OF RESERVOIR CHARACTERISTICS ON WATER PRODUCTION IN ENHANCED COALBED METHANE OPERATIONS
34 Tight Plays and Unconventional ReservoirsFriday, 28 May 20101:30 PM - 5:00 PMPlatinum 7
-
APPLICATION OF ADVANCED RESERVOIR SIMULATION WORK FLOW IN TIGHT GAS RESERVOIRS
34 Tight Plays and Unconventional ReservoirsFriday, 28 May 20101:30 PM - 5:00 PMPlatinum 7
-
THE PERMEABILITY FACTOR IN COALBED METHANE WELL COMPLETIONS AND PRODUCTION
34 Tight Plays and Unconventional ReservoirsFriday, 28 May 20101:30 PM - 5:00 PMPlatinum 7
-
A RUN HISTORY OF NEW TECHNOLOGIES IN THE BAKKEN PLAY: MULTILATERALS AND INCREASED STAGE OPENHOLE PACKER/SLEEVE SYSTEMS
34 Tight Plays and Unconventional ReservoirsFriday, 28 May 20101:30 PM - 5:00 PMPlatinum 7
-
AN EXPERIMENTAL STUDY OF ALKALINE SURFACTANT FLOODING FOR ULTRA SHALLOW HEAVY OIL RESERVOIRS
35 Managing Heavy Oil ResourcesFriday, 28 May 20101:30 PM - 4:30 PMPlatinum 8
-
TESTING AND HISTORY MATCHING OF ES SAGD (USING HEXANE)
35 Managing Heavy Oil ResourcesFriday, 28 May 20101:30 PM - 4:30 PMPlatinum 8
-
FURTHER IMPROVEMENTS IN PORE SCALE STUDIES OF SAGD PROCESS
35 Managing Heavy Oil ResourcesFriday, 28 May 20101:30 PM - 4:30 PMPlatinum 8
-
A NOVEL OILFIELD SCALE CONTROL APPROACH IN SITU ION DIVERSION THROUGH ELECTROKINETICS
37 Advances In Completion And Production OperationsFriday, 28 May 20101:30 PM - 5:00 PMPlatinum 10
-
EFFICIENCY ANALYSIS OF STEAM OVER SOLVENT INJECTION IN FRACTURED RESERVOIRS (SOS FR) METHOD FOR HEAVY OIL RECOVERY
35 Managing Heavy Oil ResourcesFriday, 28 May 20101:30 PM - 4:30 PMPlatinum 8
-
GEL DAMAGE REMEDIATION BY EVAPORATIVE MECHANISMS: A LABORATORY INVESTIGATION
37 Advances In Completion And Production OperationsFriday, 28 May 20101:30 PM - 5:00 PMPlatinum 10
-
SAND ON DEMAND: AN APPROACH TO IMPROVING PRODUCTIVITY IN HORIZONTAL WELLS UNDER HEAVY OIL PRIMARY PRODUCTION PART II
37 Advances In Completion And Production OperationsFriday, 28 May 20101:30 PM - 5:00 PMPlatinum 10
-
HEAVY OIL PRODUCTION ENHANCEMENT BY VISCOSITY REDUCTION
37 Advances In Completion And Production OperationsFriday, 28 May 20101:30 PM - 5:00 PMPlatinum 10
-
AN ANALYSIS OF THE PERFORMANCE OF GRAVEL PACKS AND SLOTTED LINERS IN HEAVY OIL OPERATIONS
37 Advances In Completion And Production OperationsFriday, 28 May 20101:30 PM - 5:00 PMPlatinum 10
-
CHEMICAL TREATMENT TO MITIGATE CONDENSATE AND WATER BLOCKING IN CARBONATE GAS WELLS
37 Advances In Completion And Production OperationsFriday, 28 May 20101:30 PM - 5:00 PMPlatinum 10
-
OPTIMIZATION OF CARBON DIOXIDE SEQUESTRATION AND ENHANCED OIL RECOVERY IN OIL RESERVOIR
39 Social Responsibility, Health, Air and Water Quality and GHG EmissionsFriday, 28 May 20101:30 PM - 3:00 PMPlatinum 9
-
REMEDIATION OF POSSIBLE LEAKAGE FROM GEOLOGIC CO2 STORAGE RESERVOIRS INTO GROUNDWATER AQUIFERS
39 Social Responsibility, Health, Air and Water Quality and GHG EmissionsFriday, 28 May 20101:30 PM - 3:00 PMPlatinum 9
-
NEW INSIGHT INTO INTEGRATED RESERVOIR MANAGEMENT USING TOP DOWN, INTELLIGENT RESERVOIR MODELING TECHNIQUE: APPLICATION TO A GIANT AND COMPLEX OIL FIELD IN THE MIDDLE EAST
25 Advanced Reservoir Modeling Concepts (Alternate)Friday, 28 May 20108:30 AM - 12:00 PMPlatinum 7
-
BIODIESEL AS SURFACTANT ADDITIVE IN STEAM ASSISTED RECOVERY OF HEAVY OIL AND BITUMEN
36 Managing Heavy Oil Resources (Alternates)Friday, 28 May 20101:30 PM - 4:30 PMPlatinum 8
-
NUMERICAL SIMULATION OF THERMAL SOLVENT REPLACING STEAM UNDER STEAM ASSISTED GRAVITY DRAINAGE (SAGD) PROCESS
36 Managing Heavy Oil Resources (Alternates)Friday, 28 May 20101:30 PM - 4:30 PMPlatinum 8
-
RESEARCH PROGRESS OF MODELLING ON COLD HEAVY OIL PRODUCTION WITH SAND
38 Advances In Completion And Production Operations (Alternates)Friday, 28 May 20101:30 PM - 5:00 PMPlatinum 10
-
A NEW MODEL FOR PREDICTING INFLOW PERFORMANCE OF FRACTURED HORIZONTAL WELLS
38 Advances In Completion And Production Operations (Alternates)Friday, 28 May 20101:30 PM - 5:00 PMPlatinum 10
-
NUMERICAL MODELING OF THE WATER IMBIBITION PROCESS IN WATER WET LABORATORY CORES - POSTER
40 Society of Petroleum Engineers (Posters)Friday, 28 May 20101:30 PM - 5:00 PMPlatinum 5-6
-
TIGHT GAS EXPLOITATION: A STOCHASTIC MODELING STUDY OF A LOW SINUOSITY RIVER SYSTEM
40 Society of Petroleum Engineers (Posters)Friday, 28 May 20101:30 PM - 5:00 PMPlatinum 5-6
-
DEEP PLACEMENT GEL BANK AS AN IOR PROCESS: MODELING, ECONOMIC ANALYSIS AND COMPARISON TO POLYMER FLOODING
40 Society of Petroleum Engineers (Posters)Friday, 28 May 20101:30 PM - 5:00 PMPlatinum 5-6
-
A UNIFIED APPROACH FOR FALLOFF AND BUILDUP TESTS ANALYSIS FOLLOWING A SHORT INJECTION/PRODUCTION TIME
40 Society of Petroleum Engineers (Posters)Friday, 28 May 20101:30 PM - 5:00 PMPlatinum 5-6
-
A NOVEL OPTIMIZATION MODEL FOR ANALYZING PRODUCTION DATA
40 Society of Petroleum Engineers (Posters)Friday, 28 May 20101:30 PM - 5:00 PMPlatinum 5-6
-
ENERGY CONSERVATION AND OIL PRODUCTION OPPORTUNITIES IN GHAWAR FIELD IN SAUDI ARAMCO
40 Society of Petroleum Engineers (Posters)Friday, 28 May 20101:30 PM - 5:00 PMPlatinum 5-6
-
AN INEQUALITY CONSTRAINED EXTENDED KALMAN FILTER FOR CONTINUAL FORECASTING OF INTERWELL CONNECTIVITIES IN WATERFLOODS
40 Society of Petroleum Engineers (Posters)Friday, 28 May 20101:30 PM - 5:00 PMPlatinum 5-6
-
TRANSIENT BEHAVIOR AND ANALYSIS OF NON DARCY FLOW IN POROUS AND FRACTURED RESERVOIRS ACCORDING TO THE BARREE AND CONWAY MODEL
40 Society of Petroleum Engineers (Posters)Friday, 28 May 20101:30 PM - 5:00 PMPlatinum 5-6
-
THE EFFECT OF SALINITY OF INJECTION BRINE ON WATER ALTERNATING GAS PERFORMANCE IN TERTIARY MISCIBLE CARBON DIOXIDE FLOODING: EXPERIMENTAL STUDY
40 Society of Petroleum Engineers (Posters)Friday, 28 May 20101:30 PM - 5:00 PMPlatinum 5-6
-
SIMULATION INVESTIGATION OF SOLVENT CO INJECTION IN VAPOR AND LIQUID PHASE TO REDUCE SHALE BARRIER IMPACT ON SAGD PERFORMANCE
40 Society of Petroleum Engineers (Posters)Friday, 28 May 20101:30 PM - 5:00 PMPlatinum 5-6
-
SIMULATION OF TIME LAPSE MINERAL CARBONATION AND ISOTOPE FRACTIONATION OF INJECTED CO2 IN AQUIFER: IMPLICATIONS FOR MONITORING CO2 SEQUESTRATION
40 Society of Petroleum Engineers (Posters)Friday, 28 May 20101:30 PM - 5:00 PMPlatinum 5-6
-
CALCULATING EQUIVALENT FRACTURE NETWORK PERMEABILITY OF MULTI LAYER COMPLEX NATURALLY FRACTURED RESERVOIRS
40 Society of Petroleum Engineers (Posters)Friday, 28 May 20101:30 PM - 5:00 PMPlatinum 5-6
-
IMPROVED WELL FRACTURE STIMULATION PERFORMANCE THROUGH THE APPLICATION OF UNIQUE SOLID CHEMICAL INHIBITORS
40 Society of Petroleum Engineers (Posters)Friday, 28 May 20101:30 PM - 5:00 PMPlatinum 5-6
-
MECHANICS AND UP SCALING OF HEAVY OIL BITUMEN RECOVERY BY STEAM OVER SOLVENT INJECTION IN FRACTURED RESERVOIRS (SOS FR) METHOD
40 Society of Petroleum Engineers (Posters)Friday, 28 May 20101:30 PM - 5:00 PMPlatinum 5-6
-
INVESTIGATION OF OIL BY PASSED MECHANISMS FOR IMPROVED OIL RECOVERY IN DEEPWATER GULF OF MEXICO
40 Society of Petroleum Engineers (Posters)Friday, 28 May 20101:30 PM - 5:00 PMPlatinum 5-6
-
PRODUCTIVITY LOSS IN GAS WELLS DUE TO SALT DEPOSITION
40 Society of Petroleum Engineers (Posters)Friday, 28 May 20101:30 PM - 5:00 PMPlatinum 5-6
-
FIELD BRINE COMPOSITION IMPACT ON TERTIARY OIL RECOVERY FROM CARBONATE RESERVOIRS AN EXPERIMENTAL STUDY
40 Society of Petroleum Engineers (Posters)Friday, 28 May 20101:30 PM - 5:00 PMPlatinum 5-6
-
ENSEMBLE BASED OPTIMIZATION OF EOR PROCESSES
40 Society of Petroleum Engineers (Posters)Friday, 28 May 20101:30 PM - 5:00 PMPlatinum 5-6
-
A NEW SEMI ANALYTICAL MODELING OF TOE TO HEEL AIR INJECTION IN IN SITU COMBUSTION PROCESS
40 Society of Petroleum Engineers (Posters)Friday, 28 May 20101:30 PM - 5:00 PMPlatinum 5-6
-
NEW CONCEPTS OF THE OPTIMUM MICROEMULSION PHASE TYPE AND THE OPTIMUM SALINITY PROFILE IN SURFACTANT/POLYMER FLOODING
40 Society of Petroleum Engineers (Posters)Friday, 28 May 20101:30 PM - 5:00 PMPlatinum 5-6
-
STORAGE AND OUTPUT FLOW FROM SHALE AND TIGHT GAS RESERVOIRS
40 Society of Petroleum Engineers (Posters)Friday, 28 May 20101:30 PM - 5:00 PMPlatinum 5-6
-
THE POTENTIAL OF NCG ENHANCED SAGD APPLICATION IN US HEAVY OIL RESERVOIRS
40 Society of Petroleum Engineers (Posters)Friday, 28 May 20101:30 PM - 5:00 PMPlatinum 5-6
-
SIMULATION OF CYCLIC STEAM INJECTION INCLUDING THE EFFECTS OF TEMPERATURE INDUCED WETTABILITY ALTERATION
35 Managing Heavy Oil ResourcesFriday, 28 May 20101:30 PM - 4:30 PMPlatinum 8
-
TEMPERATURE INDUCED FRACTURE RECONSOLIDATION OF DIATOMACEOUS ROCK DURING FORCED WATER IMBIBITION
26 California Monterey ReservoirsFriday, 28 May 20108:30 AM - 12:00 PMPlatinum 10
-
THE EFFECT OF TEMPERATURE AND OIL VISCOSITY REDUCTION ON WATER IMBIBITION OF DIATOMITE
26 California Monterey ReservoirsFriday, 28 May 20108:30 AM - 12:00 PMPlatinum 10
-
ENHANCEMENTS TO GPS BASED SUBSIDENCE MONITORING AT THE WILMINGTON OIL FIELD
39 Social Responsibility, Health, Air and Water Quality and GHG EmissionsFriday, 28 May 20101:30 PM - 3:00 PMPlatinum 9
-
ALASKAN HEAVY OIL: FIRST CHOPS AT A VAST, UNTAPPED ARCTIC RESOURCE
5 Arctic Operations/Permafrost Issues/HydratesThursday, 27 May 201010:30 AM - 12:30 PMPlatinum 7
-
EVALUATION OF TWO NORTH SLOPE, ALASKA, DEPOSITS FOR A POTENTIAL LONG TERM TEST OF GAS PRODUCTION FROM HYDRATES
5 Arctic Operations/Permafrost Issues/HydratesThursday, 27 May 201010:30 AM - 12:30 PMPlatinum 7
-
STUDY ON PORE SCALE DISTRIBUTION OF FROZEN WATER AND ITS EFFECT ON RELATIVE PERMEABILITY OF OIL IN PERMAFROST RESERVOIR ROCKS
5 Arctic Operations/Permafrost Issues/HydratesThursday, 27 May 201010:30 AM - 12:30 PMPlatinum 7
-
ADDRESSING HORIZONTAL STEAM INJECTION COMPLETIONS CHALLENGES WITH CHEVRON'S HORIZONTAL STEAM TEST FACILITY
6 Advances in Drilling and Completion TechnologyThursday, 27 May 20108:30 AM - 12:00 PMPlatinum 8
-
THE EFFECT OF RESERVOIR HETEROGENEITY ON GAS PRODUCTION FROM HYDRATE ACCUMULATIONS IN THE PERMAFROST
5 Arctic Operations/Permafrost Issues/HydratesThursday, 27 May 201010:30 AM - 12:30 PMPlatinum 7
-
CATALYTIC PROPERTIES OF CLAY BASED HYBRID MATERIALS FOR DRILLING OPERATIONS CORRESPONDING AUTHOR'S COMPANY: UNIVERSITY OF PITTSBURGH
6 Advances in Drilling and Completion TechnologyThursday, 27 May 20108:30 AM - 12:00 PMPlatinum 8
-
THERMAL MODELING OF DRILLING INTO STEAM CHAMBERS
6 Advances in Drilling and Completion TechnologyThursday, 27 May 20108:30 AM - 12:00 PMPlatinum 8
-
DEVELOPMENT AND FIELD PILOT OF A NOVEL VISCOELASTIC ANIONIC SURFACTANT (VAS) FRACTURING FLUID
6 Advances in Drilling and Completion TechnologyThursday, 27 May 20108:30 AM - 12:00 PMPlatinum 8
-
METHOD FOR MINIMIZING LINER EXPANSION ISSUES IN HORIZONTAL THERMAL APPLICATIONS
6 Advances in Drilling and Completion TechnologyThursday, 27 May 20108:30 AM - 12:00 PMPlatinum 8
-
AN IMPROVED LABORATORY METHOD TO ESTIMATE FLOW INITIATION PRESSURES AND RETURN PERMEABILITIES DURING FLOWBACK
6 Advances in Drilling and Completion TechnologyThursday, 27 May 20108:30 AM - 12:00 PMPlatinum 8
-
BEST PRACTICES IN TESTING AND ANALYZING MULTILAYER RESERVOIRS
8 Reservoir Characterization IThursday, 27 May 20108:30 AM - 12:00 PMPlatinum 10
-
INTEGRATION OF 3D SEISMIC ATTRIBUTES INTO STOCHASTIC RESERVOIR MODELS USING ITERATIVE VERTICAL RESOLUTION MODELING METHODOLOGY
8 Reservoir Characterization IThursday, 27 May 20108:30 AM - 12:00 PMPlatinum 10
-
ROBUST WELL TEST INTERPRETATION USING NONLINEAR REGRESSION WITH PARAMETER AND DATA TRANSFORMATIONS
8 Reservoir Characterization IThursday, 27 May 20108:30 AM - 12:00 PMPlatinum 10
-
DEVELOPMENT OF PETROPHYSICAL STRESS MODELS FOR CONVERSION OF CORE POROSITY AND PERMEABILITY DATA FROM AMBIENT TO RESERVOIR CONDITIONS: A NEW HYBRID APPROACH
8 Reservoir Characterization IThursday, 27 May 20108:30 AM - 12:00 PMPlatinum 10
-
EFFECT OF FRACTURE AND FLOW ORIENTATION ON TWO PHASE FLOW IN AN OIL WET FRACTURE: RELATIVE PERMEABILITY CURVES AND FLOW STRUCTURES
8 Reservoir Characterization IThursday, 27 May 20108:30 AM - 12:00 PMPlatinum 10
-
APPLICATION OF LITHOFACIES MODELS TO CHARACTERIZE UNCONVENTIONAL SHALE GAS RESERVOIRS AND IDENTIFY OPTIMAL COMPLETION INTERVALS
8 Reservoir Characterization IThursday, 27 May 20108:30 AM - 12:00 PMPlatinum 10
-
FEASIBILITY INVESTIGATION OF CO2 MISCIBLE FLOODING IN SOUTH SLATTERY MINNELUSA RESERVOIR, WYOMING
14 EOR Technologies IThursday, 27 May 20101:30 PM - 5:00 PMPlatinum 7
-
EFFECT OF INTERSTITIAL WATER SATURATION AND AIR FLUX ON COMBUSTION KINETICS OF HIGH PRESSURE AIR INJECTION (HPAI)
14 EOR Technologies IThursday, 27 May 20101:30 PM - 5:00 PMPlatinum 7
-
PARALLEL SIMULATIONS OF COMMERCIAL SCALE POLYMER FLOODS
14 EOR Technologies IThursday, 27 May 20101:30 PM - 5:00 PMPlatinum 7
-
NOVEL IN SITU COMBUSTION TECHNIQUE USING A SEMI PERMEABLE COLLOIDAL SYSTEM
14 EOR Technologies IThursday, 27 May 20101:30 PM - 5:00 PMPlatinum 7
-
EFFECT OF ELASTICITY DURING VISCOELASTIC POLYMER FLOODING A POSSIBLE MECHANISM OF INCREASING THE SWEEP EFFICIENCY
14 EOR Technologies IThursday, 27 May 20101:30 PM - 5:00 PMPlatinum 7
-
A MORE COMPLETE MODEL FOR INJECTION WELL TESTING THAT INCLUDES THE EFFECTS OF SOLIDS DEPOSITION, TWO PHASE FLOW AND INJECTION INDUCED FRACTURES
15 Mature Waterflood ManagementThursday, 27 May 20101:30 PM - 5:00 PMPlatinum 8
-
OPTIMIZING VOLUMETRIC SWEEP EFFICIENCY IN WATERFLOODS BY INTEGRATING STREAMLINES, DESIGN OF EXPERIMENTS, AND HYDROCARBON F PHI CURVES
15 Mature Waterflood ManagementThursday, 27 May 20101:30 PM - 5:00 PMPlatinum 8
-
A NEW DIAGNOSTIC TOOL FOR PERFORMANCE EVALUATION OF MATURE HEAVY OIL WATERFLOODS: CASE OF WESTERN CANADIAN HEAVY OIL RESERVOIRS
15 Mature Waterflood ManagementThursday, 27 May 20101:30 PM - 5:00 PMPlatinum 8
-
WATERFLOOD TOMOGRAPHY: MAPPING HIGH CONTRAST PERMEABILITY STRUCTURES USING INJECTION/PRODUCTION DATA
15 Mature Waterflood ManagementThursday, 27 May 20101:30 PM - 5:00 PMPlatinum 8
-
IDENTIFYING INJECTOR PRODUCER RELATIONSHIP IN WATERFLOOD USING HYBRID CONSTRAINED NONLINEAR OPTIMIZATION
15 Mature Waterflood ManagementThursday, 27 May 20101:30 PM - 5:00 PMPlatinum 8
-
A MULTIVARIATE AUTOREGRESSIVE MODEL FOR CHARACTERIZING PRODUCER PRODUCER RELATIONSHIPS IN WATERFLOODS FROM INJECTION/PRODUCTION RATE FLUCTUATIONS
15 Mature Waterflood ManagementThursday, 27 May 20101:30 PM - 5:00 PMPlatinum 8
-
A METHOD TO QUICKLY ESTIMATE THE PROBABLE VALUE OF A SHALE GAS WELL
17 Economic Uncertainty And Risk AnalysisThursday, 27 May 20101:30 PM - 4:30 PMPlatinum 10
-
QUANTIFYING THE FATE OF HYDRATE INHIBITOR IN AN HPHT GAS CONDENSATE SUBSEA TIEBACK
17 Economic Uncertainty And Risk AnalysisThursday, 27 May 20101:30 PM - 4:30 PMPlatinum 10
-
FAILURE PREDICTION FOR ARTIFICIAL LIFT SYSTEMS
17 Economic Uncertainty And Risk AnalysisThursday, 27 May 20101:30 PM - 4:30 PMPlatinum 10
-
INTELLIGENT MODEL MANAGEMENT AND VISUALIZATION FOR SMART OILFIELDS
17 Economic Uncertainty And Risk AnalysisThursday, 27 May 20101:30 PM - 4:30 PMPlatinum 10
-
INTEGRATED RISK ANALYSIS CRITERIA FOR MANAGING EXPLORATION AND DEVELOPMENT OF OIL AND GAS ASSETS
17 Economic Uncertainty And Risk AnalysisThursday, 27 May 20101:30 PM - 4:30 PMPlatinum 10
-
DIRECTIONAL HOLE CLEANING PROCESS REVIEW: A SYSTEMATIC VIEW
7 Advances in Drilling and Completion Technology (Alternate)Thursday, 27 May 20108:30 AM - 12:00 PMPlatinum 8
-
DATA DRIVEN MAPPING OF LIQUID SATURATION IN WATERFLOODS USING INJECTION AND PRODUCTION DATA
16 Mature Waterflood Management (Alternates)Thursday, 27 May 20101:30 PM - 5:00 PMPlatinum 8
-
MONITORING WATER FRONT ADVANCE AND BILINEAR FLOW BEHAVIOUR ON PRESSURE TRANSIENT TESTS IN HORIZONTAL WELLS
16 Mature Waterflood Management (Alternates)Thursday, 27 May 20101:30 PM - 5:00 PMPlatinum 8
-
MODELING GAS PHASE MASS TRANSFER BETWEEN FRACTURE AND MATRIX IN NATURALLY FRACTURED RESERVOIRS
14 EOR Technologies IThursday, 27 May 20101:30 PM - 5:00 PMPlatinum 7
2006
-
ASPECT OF RESERVOIR CHARACTERIZATION FROM WATERFLOOD PERFORMANCE DATA
32 SPE: Reservoir Characterization & Formation EvaluationWednesday, 10 May 20068:00 AM - 11:20 AM
-
DYNAMIC MODELING OF PARTIAL LIQUID LIFT FOR STRIPPER GAS WELLS
22 SPE: Production Optimization & Artificial LiftTuesday, 9 May 20061:00 PM - 5:00 PM
-
REDUCING ELECTRIC PUMPING CONSUMPTION IN MATURE FIELDS: CASE STUDIES
22 SPE: Production Optimization & Artificial LiftTuesday, 9 May 20061:00 PM - 5:00 PM
Date Unknown
-
AUTOMATED LIQUID UNLOADING IN LOW PRESSURE GAS WELLS USING INTERMITTENT AND DISTRIBUTED HEATING OF WELLBORE FLUID
15 SPE: Improved Oil Recovery and Reservoir Management