118 Geoscience Education V: Innovations in Geoscience Education
Monday, 10 October 2011
1:30 PM - 5:30 PM
Room 208CD
BUILDING A REAL TIME HYDROLOGIC DATA ACQUISITION AND TRANSMISSION FACILITY AT THE UNIVERSITY OF NORTHERN IOWA
Paper number: 118-4
Program: Technical Sessions
Time: 2:15 PM – 2:30 PM
Authors
-
Maureen ClaytonUniversity of Northern Iowa, Cedar Falls, IA
Abstract
Four (4) pieces of instruments are in the process of being installed at the experimental site. The instruments are 1) YSI 6600 V2 extended deployment probe to measure water quality parameters in the Dry Run Creek (i.e., pH, Total Dissolved Solids, conductivity, Dissolved Oxygen, temperature, turbidity, chlorophyll, etc.); 2) OTT RLS Radar to measure water level fluctuations in the creek; 3) Hydrolab MS5 mini-sonde to continuously measure pH, TDS, conductivity, DO, temperature, turbidity, and nitrate in a 70 ft deep ground water well on the site; and 4) DL 3000 data logger to receive all data from the above 3 pieces of equipment and automatically upload them to a website. Site preparation, including digging trenches for data cable and electric wires has been completed. Instrumental calibration is in progress and the site is expected to be up and running soon. We expect that this well site expansion plan will considerably strengthen our hydrology curriculum and facilitate more effective dissemination of the project outcome.